+917292009966 +917292006699 Whatsapp
Tasha Realty
 
 

News: Human Rights Panel Orders Gurugram Drain Technical Audit-11-09-2026

The Haryana Human Rights Commission (HHRC) ordered civic bodies on Friday to carry out a full technical audit of Gurugram’s storm-water drainage and prepare an integrated city-wide revamp plan, officials said.

Assistant registrar Dr Puneet Arora said the commission acted suo motu on HT’s August reports of severe waterlogging, traffic paralysis, disrupted essential services, and hardship for residents, commuters and school-going children. The bench under chairperson justice Lalit Batra saw a repeating pattern of flooding and weak civic infrastructure, not a one-off rain disruption.

District administration figures put August 24 rainfall near 75mm, with waterlogging at Subhash Chowk, Rajiv Chowk, Narsinghpur, Iffco Chowk, Sohna Road, Sheetla Mata Road, NH-48/Delhi-Gurugram Expressway and parts of Old Gurugram. It noted stranded school buses, parents unable to reach children and held-up ambulances. A service road cave-in near Iffco Chowk, sewerage pipeline damage or leakage, and a major water-supply pipeline damage that cut supply in several sectors, justify assessing drains, sewage, water pipelines, utilities and roads together, it said.

The Gurugram Metropolitan Development Authority (GMDA), with the district administration, MCG, HSVP, PWD (B&R), PHED, Irrigation and Water Resources Department, DHBVN and town planning authorities, must examine drainage capacity, natural drains, traditional watercourses, ponds, low-lying areas and chronic waterlogging points, including the 99 locations reportedly identified.

A time-bound plan, grounded in hydrological, hydraulic, environmental and engineering studies, must set short-, medium- and long-term measures, not only desilting or temporary pumping. A GIS-based map of natural and engineered channels should mark obstructions, encroachments or alterations, with lawful action proposed. Authorities should test whether the system suits current rainfall intensity and projected urbanisation. Underground reservoirs, high-capacity rainwater injection wells and recharge structures can be included only after site-specific technical, hydrogeological and environmental assessment.

A conjoint compliance report from GMDA, district administration and the civic, engineering, utility, education and police authorities is due a week before the December 15, 2026 hearing, Dr Arora said. The commission also wants a report on the SOP for school transport in heavy rainfall, including real-time bus tracking, school-parent communication, safe holding points and evacuation of children if buses are stranded, and emergency corridors for ambulances, fire services and police.

DISCLAIMER: This website and the Information contained is in the process of being updated and the contents are under review/revision in terms of the Real Estate Regulation Act, 2016 and Rules there under (RERA), and will be reviewed from time to time. Till the time that the contents are fully updated, the same shall neither be construed to be any kind of advertisement, solicitation, marketing, Booking, offer for sale, invitation to offer within the purview of RERA and shall have no binding effect on the Company and nor constitute any offer and/or acceptance and/or contract and/or agreement and/or transaction and/or any intention thereof and/or a disclosure under any statute of any nature whatsoever. Please call to check the updated pricing, status etc. The photographs contained herein may be actual/stock/standard photography or rendered images used for the purpose and have been taken at a location other than the project site and are used to indicate a conceptual lifestyle. Actual product may vary/differ from what is indicated herein. The location info shown are indicative and selective representation of certain elements present/that may be present in and around the city/project site. No representations are made regarding existence/continuity of existence of any landmarks/locations shown. The landmarks/locations may be subject to change from time to time and such changes are completely outside our control. No representation or warranty is made or intended as to the accuracy or completeness of information under this website or as to its suitability or adequacy for any purpose. Before making a decision to purchase, you are requested to independently, either directly or through your legal/financial consultants, thoroughly verify all details/documents pertaining to the respective project as available on the respective RERA sites.The Company is not liable for any consequence of any action taken by the viewer relying only on such material/ information that is presently displayed on this website.