+917292009966 +917292006699 Whatsapp
Tasha Realty
 
 

News: 33 of 40 Flagged NH-48 Spots Repaired in Gurugram-14-07-2026

Footpaths, green verges and traffic islands along the Delhi-Gurugram (NH-48) corridor at Rajiv Chowk, Jharsa and Signature Towers have been upgraded over the past two months, with 33 of 40 deficient locations fixed, according to a National Highways Authority of India (NHAI) report.

The locations were identified in May during a joint inspection of an 11km stretch by NHAI, the Municipal Corporation of Gurugram (MCG) and the Gurugram Metropolitan Development Authority (GMDA). Footpaths, central verges, crash barriers, bollards and lane markings were found damaged or poorly kept.

The report recorded broken crash barriers and littering between the main carriageway and service lanes at Rajiv Chowk. Nine locations had damaged footpaths, 12 had green verges needing maintenance, 15 had poor sanitation and littering, and 19 had damaged or inadequate safety infrastructure. Improper traffic channelisation at the Jharsa intersection confused motorists.

NHAI officials said work between May and June included footpath restoration at seven locations and safety improvements, such as replacing crash barriers, at 15. Green verges at nine locations are under daily monitoring, with plantation, protection and painting in progress. A contractor at Rajiv Chowk said seasonal plantation is complete on at least half the roadside patches there and at Jharsa.

The inspections were part of a beautification drive under the Clean City Action Plan 2026 to add green cover, remove encroachments, improve safety and cut emissions. The campaign began after chief minister Nayab Singh Saini inspected works at the three sites on April 26.

A senior NHAI official said the Signature Towers exit, Sector 31 service roads and Jharsa will get pedestrian and commuter safety upgrades in the coming weeks, with phased work at all pending spots. Upgrades are also planned at MDI Chowk, Atul Kataria Chowk and Sheetla Mata Road, and MCG sanitary teams have been told to step up checks on littering.

The effort belongs to a wider programme running since 2021, when GMDA identified 106 junctions for pedestrian-friendly upgrades. Approved projects since include smart traffic signals, a 64km footpath revamp, four flyovers, nine foot overbridges and a six-lane elevated corridor along NH-48.

DISCLAIMER: This website and the Information contained is in the process of being updated and the contents are under review/revision in terms of the Real Estate Regulation Act, 2016 and Rules there under (RERA), and will be reviewed from time to time. Till the time that the contents are fully updated, the same shall neither be construed to be any kind of advertisement, solicitation, marketing, Booking, offer for sale, invitation to offer within the purview of RERA and shall have no binding effect on the Company and nor constitute any offer and/or acceptance and/or contract and/or agreement and/or transaction and/or any intention thereof and/or a disclosure under any statute of any nature whatsoever. Please call to check the updated pricing, status etc. The photographs contained herein may be actual/stock/standard photography or rendered images used for the purpose and have been taken at a location other than the project site and are used to indicate a conceptual lifestyle. Actual product may vary/differ from what is indicated herein. The location info shown are indicative and selective representation of certain elements present/that may be present in and around the city/project site. No representations are made regarding existence/continuity of existence of any landmarks/locations shown. The landmarks/locations may be subject to change from time to time and such changes are completely outside our control. No representation or warranty is made or intended as to the accuracy or completeness of information under this website or as to its suitability or adequacy for any purpose. Before making a decision to purchase, you are requested to independently, either directly or through your legal/financial consultants, thoroughly verify all details/documents pertaining to the respective project as available on the respective RERA sites.The Company is not liable for any consequence of any action taken by the viewer relying only on such material/ information that is presently displayed on this website.