+917292009966 +917292006699 Whatsapp
Tasha Realty
 
 

News: Gurugram to Close 12 Road Cuts, Open 33 on Metro Corridor-18-02-2026

To keep traffic moving during metro construction between Millennium City Centre and Hero Honda Chowk, the Gurugram Metropolitan Development Authority (GMDA) will close 12 entry and exit points on Netaji Subhash Chandra Bose Marg and open 33 new ones near junctions, so vehicles join the main carriageway through service roads.

The decision follows a joint survey with the traffic department, which found that the 12 direct links from adjoining sectors and villages were slowing traffic. Gurugram Metro Rail Limited (GMRL) has been asked to carry out the changes within 15 days. Service roads on both sides will be made fully usable to add capacity.

Cuts to be closed include those near the GMDA office in Sector 44, Greenwood City in Sector 46, Unitech Cyber Park in Sector 39, in front of Cyber Park in Sector 46 and three in Jharsa village. The divider opening in front of Sector 39 will be shut, and near the Sector 47 petrol pump the direct exit for traffic from State Vigilance will be replaced by one through the service road.

Executive engineer Amit Godara said each lane is being barricaded and pressure on the main road will rise once barricading is complete, so traffic will be diverted to service roads.

GMRL’s first-phase contract covers a 15.5 km route, including 7.5 km on this road, about 20 per cent of which is already barricaded. The corridor carries roughly 70,000 vehicles a day.

DISCLAIMER: This website and the Information contained is in the process of being updated and the contents are under review/revision in terms of the Real Estate Regulation Act, 2016 and Rules there under (RERA), and will be reviewed from time to time. Till the time that the contents are fully updated, the same shall neither be construed to be any kind of advertisement, solicitation, marketing, Booking, offer for sale, invitation to offer within the purview of RERA and shall have no binding effect on the Company and nor constitute any offer and/or acceptance and/or contract and/or agreement and/or transaction and/or any intention thereof and/or a disclosure under any statute of any nature whatsoever. Please call to check the updated pricing, status etc. The photographs contained herein may be actual/stock/standard photography or rendered images used for the purpose and have been taken at a location other than the project site and are used to indicate a conceptual lifestyle. Actual product may vary/differ from what is indicated herein. The location info shown are indicative and selective representation of certain elements present/that may be present in and around the city/project site. No representations are made regarding existence/continuity of existence of any landmarks/locations shown. The landmarks/locations may be subject to change from time to time and such changes are completely outside our control. No representation or warranty is made or intended as to the accuracy or completeness of information under this website or as to its suitability or adequacy for any purpose. Before making a decision to purchase, you are requested to independently, either directly or through your legal/financial consultants, thoroughly verify all details/documents pertaining to the respective project as available on the respective RERA sites.The Company is not liable for any consequence of any action taken by the viewer relying only on such material/ information that is presently displayed on this website.